Background Image
Previous Page  35 / 60 Next Page
Information
Show Menu
Previous Page 35 / 60 Next Page
Page Background

perspective, the buildings will be even more identifiable as

an ensemble, permitting a discernible integrated design

concept for the CCH, the hotel and the entrance area. One of

the main construction projects will be to redesign the CCH

forecourt. The plans for the construction also envisage a

new, high entrance hall flooded with light. In addition, there

will be barrier-free access from and to the Dammtor mainline

train station.

THE PLAN FOR THE “NEW CCH”

envisages a total of

36,000 square metres of usable space – roughly the size of

five football pitches – in the interior. As vertical and horizon-

tal separation is possible, the new space and room divisions

make the CCH suited to hosting several large-scale events at

the same time. Seating for up to 12,000 will be provided in

as many as 50 rooms. In 2019, the CCH will therefore regain

its position as Germany’s premier convention centre. The

calendar for the period after construction work has ended

is already filling up because convention venues are usually

booked years in advance.

✱ ✱ ✱

To get an idea of what the CCH will look

like, visit our website and take a virtual tour

of the building.

POSITIVE TREND IN

ATTENDANCE FIGURES

353,580 390,101

2013

2014

332,392

2012

33

Hamburg Messe und Congress | Annual Report 2014

THE NEW CCH